Product Name: Gestra PRS 8-F cycling timer
Brand: Gestra
Product Code: PRS 8-F valve
Tags: Gestra
Gestra timer
Gestra PRS 8-F
Gestra PRS cycling
PRS 8-F
Gestra PRS cycling timer
cycling timer
Gestra timer
Gestra 8-F cycling timer
Gestra PRS 8-F timer
8-F cycling timer
8-F cycling
PRS 8-F timer
PRS cycling
Gestra PRS 8-F cycling timer
PRS 8-F cycling
Gestra 8-F cycling
PRS cycling timer
Cycling timer PRS 8
您对制造商Gestra的产品Gestra PRS 8-F cycling timer,代码为PRS 8-F valve感兴趣吗?立即联系我们获取报价。Imtek Engineering,世界上最快最可靠的工业设备供应商,将为您提供最佳报价!
Get Offer With E-Mail: info@im-tek.com
Get a offer for Gestra PRS 8-F cycling timer from our live support team now!
Description Electronic unit for the generation of periodic pulses to initiate a blowdown cycle via the GESTRA rapid-action intermittent blowdown valve type MPA 46 or 47, i.e. automation of intermittent boiler blowdown. Equipment for steam boilers to TRD 401, section 6.4. The programme-controlled blowdown system consists of an electronic cycling timer, a three-way solenoid valve and a strainer. The equipment meets the German regulations for use in steam-boiler plants operating without constant supervision or with limited supervision (TRD 602 and TRD 604, sheet 1).